Add "TOTAL" columns to conduit run schedule for parallel runs

16 votes

When exporting conduit run schedule for conduit lengths, we still have to manually multiply the "modeled length" and "wire length" by the parallel qty in order to get an accurate length. If that process was automated it would save a lot of time.

Planned (Added to Roadmap) ConduitFill Suggested by: Juan Blanco Upvoted: 23 Apr Comments: 2