Add "TOTAL" columns to conduit run schedule for parallel runs
When exporting conduit run schedule for conduit lengths, we still have to manually multiply the "modeled length" and "wire length" by the parallel qty in order to get an accurate length. If that process was automated it would save a lot of time.
Comments: 2
-
13 Feb, '23
Juan BlancoThe conduit run schedule "modeled length" and "wire length" only calculates the longest length of a parallel run. If there was another column that combined the "totals" (ie longest modeled/wire length multiplied (x) by the number (#) of parallel runs) that would provided a more accurate length for schedules and ordering.
-
23 Apr, '24
Laviniu RusteiAdditionally the "wire length" column only calculates the length of a single wire in the conduit. User still has to further multiply by the number of wires in the conduit and do it separately for each wire size. Separate "wire length" columns for different wire sizes in the same conduit would be helpful (the ground wire is always smaller than the phase/neutral wire for feeders). I just don't know if that can be easily incorporated in the Evolve schedule.