Assign Run Id tool needs some serious optimization
Out of hundreds of Run Ids listed in the project, it is very hard to scroll down and select the desired Run id value while assigning runs. It feels like an inefficient way to do it.
I'm aware of the 'only show available runs' check box option, but that feature is painfully slow. That is why evolve needs to optimize the feature to make it more efficient.
My suggestions are:
1. Instead of entering run ids in the conduit run schedule first and then going to the Assign Run id tool to pick the desired conduit and assign the value, combine both these steps. That is Assign run id tool should be able to create and assign a run Id when a conduit is selected.
2. If the first suggestion is too much work to do, at least add a search box in the assign run id tool to type and filter down the desired Run id value.
Thanks
Comments: 3
-
05 Oct, '22
RileyIf you start typing in the "Edit Value is Null" space in the Assign Run ID tool, it will filter the list. That solves the option 2 portion. Just FYI.
2 -
10 Jan, '23
Brad NydamI would really like the option to skip this step entirely and just enter in the ConduitRun_Id / ConduitRun_ParallelId in the conduit properties and have the Conduit run Update button (or something similar) fill in the rest of the details from the Conduit Run Schedule. Currently I can populate these fields to all connected elements, and Evolve only partially recognizes the results.
-
01 Feb, '23
Shawn BrennanI agree with Brad's comment. Being able to enter a feeder ID early on during coordination would be great. I don't need the remainder of the data. However, that data should also be pushed through all connected conduit/conduit fittings.